what about caribou? we need to protect them as they are not far away. what has been said about caribou?
Executive Summary
The proposed Revell Site Deep Geological Repository (DGR) is located in an unorganized territory along the Trans-Canada Highway (Highway 17). Regarding woodland caribou, the Nuclear Waste Management Organization (NWMO) has explicitly excluded the species from its environmental baseline studies.
The proponent justifies this exclusion by stating that the nearest regulated habitat boundary (the Churchill Range) is approximately 61 kilometers north of the site. However, public commenters and internal technical reviews have heavily criticized this omission.
Critics argue that relying on static distance buffers ignores the biological realities of migratory patterns, cumulative industrial impacts, and climate-induced habitat shifts. A comprehensive regional connectivity analysis is required to ensure the species is adequately protected.
Detailed Analysis
Regulatory Exclusion vs. Biological Reality
The NWMO's current stance relies strictly on existing regulatory boundaries to define the scope of its wildlife studies. According to the proponent's documentation, the project site is situated 61 kilometers south of the regulated habitat range for woodland caribou.
Consequently, the NWMO claims there are no federal or provincial regulatory triggers requiring the inclusion of caribou in their baseline assessments [Analysis: 14.11 Species at Risk and their Habitat]. This legalistic approach to environmental assessment has been identified as a critical deficiency.
By adhering strictly to static bureaucratic thresholds, the proponent fails to account for the expansive home ranges and migratory corridors utilized by large ungulates. Wildlife populations do not adhere to administrative lines drawn on a map, especially in the vast, interconnected ecosystems of Northwestern Ontario.
Climate Change and Cumulative Pressures
The exclusion of woodland caribou also fails to integrate the compounding variables of climate change and regional industrialization. As temperatures rise and weather patterns become more erratic, species are frequently forced to alter their historical ranges to find suitable foraging and calving grounds.
The proponent's static 61-kilometer buffer does not account for these inevitable ecological shifts over the multi-generational lifespan of the DGR project. Furthermore, the unorganized territories surrounding the Revell Site are already subject to significant pressures from forestry, mining exploration, and heavy traffic along Highway 17.
The cumulative impact of these activities, combined with the massive infrastructure footprint of the DGR, threatens to further fragment potential refuge habitats. Ignoring caribou in the baseline studies prevents a holistic understanding of how the project might impede future species recovery efforts.
IAAC Summary of Issues Alignment
The concerns raised regarding the exclusion of woodland caribou align directly with several key themes identified in the IAAC Summary of Issues. Specifically, the Agency noted public apprehension regarding "insufficient information on species at risk and their habitats in the area surrounding the project."
The IAAC explicitly highlighted the need for information on "direct and indirect pathways of effects" on these vulnerable populations. While the Summary of Issues does not single out caribou by name, the community's demand for broader ecological inclusion perfectly mirrors the Agency's identified gaps in terrestrial wildlife data.
The IAAC also documented concerns regarding "levels of disturbance, displacement, or harm" to local wildlife. The proponent's refusal to study caribou based on a 61-kilometer technicality directly conflicts with the public's demand for comprehensive displacement modeling [Analysis: 14.11 Species at Risk and their Habitat].
Additionally, the IAAC Summary of Issues points to "Cumulative environmental effects," citing the combined pressures of past and existing mining and forestry activities. The community's fear that the DGR will exacerbate regional habitat fragmentation for wide-ranging species like caribou is a core component of this cumulative risk profile.
Evidence from Public Registry
Public submissions reveal acute anxiety regarding the health of regional ungulate populations. The Manitoba Métis Federation (MMF), representing the National Government of the Red River Métis, explicitly identified caribou as a species of high concern.
Their submission emphasized that caribou are already in decline due to the compounding effects of climate change and existing industrial development [Comment Ref: 517]. The MMF's comments underscore the cultural and subsistence importance of these animals to Indigenous communities.
The fear is that the introduction of a massive nuclear infrastructure project, complete with heavy transport along Highway 17, will accelerate the degradation of the broader regional ecosystem. This public testimony directly challenges the NWMO's assertion that the project's distance from the Churchill Range negates the need for study.
Technical Deficiencies & Gaps
Internal technical reviews have severely criticized the NWMO's methodology regarding Species at Risk (SAR). The decision to exclude woodland caribou based solely on a 61-kilometer distance buffer is viewed as an arbitrary and scientifically unsound limitation.
This approach prioritizes administrative convenience over the Precautionary Principle, which is essential for a project carrying millennial-scale risks [Analysis: 14.11 Species at Risk and their Habitat]. Our analysis indicates that the proponent's reliance on "opportunistic identification" and desktop studies is insufficient for characterizing the complex ecological web of the Revell Site.
By dismissing species that fall just outside current regulatory boundaries, the NWMO creates a critical data vacuum. This vacuum prevents the Impact Assessment Agency of Canada (IAAC) from accurately evaluating the project's true regional footprint [Analysis: 14.10 Terrestrial Wildlife and Wildlife Habitat].
Furthermore, the proponent's documentation fails to provide a landscape connectivity analysis. Without understanding how the Revell Site functions as a potential movement corridor or genetic bridge between adjacent wilderness areas, the assertion that caribou will remain unaffected is entirely speculative.
Recommendations & Mandates
To rectify these critical ecological oversights, we strongly recommend that the proponent be compelled to abandon its reliance on static distance buffers. The NWMO must initiate a comprehensive, regional habitat connectivity and fragmentation analysis that explicitly includes wide-ranging species such as the woodland caribou and wolverine.
We strongly recommend that this connectivity analysis model the potential for climate-induced range shifts over the next century. The proponent must demonstrate how the industrialization of the Revell Site, including the heavy transport corridor along Highway 17, will interact with changing migration patterns.
Finally, we strongly recommend that the proponent co-develop a regional wildlife monitoring framework with local Indigenous communities and residents of the unorganized territories. This framework must integrate Traditional Ecological Knowledge to identify historical caribou presence and potential future refuge habitats that may not be captured in standard provincial databases.
Conclusion
The NWMO's decision to exclude woodland caribou from its environmental baseline studies represents a significant failure of ecological foresight. Relying on a 61-kilometer administrative boundary ignores the dynamic nature of wildlife migration, the realities of climate change, and the cumulative industrial pressures facing the unorganized territories of Northwestern Ontario.
For the impact assessment to be considered rigorous and credible, the proponent must address the concerns raised by the public and internal analysts. A holistic, regional approach to Species at Risk is required to ensure that the Deep Geological Repository does not inadvertently sever critical ecological corridors or accelerate the decline of culturally vital species like the woodland caribou.
About the Deep Geological Repository (DGR) for Canada's Used Nuclear Fuel Project
The Nuclear Waste Management Organization (the NWMO) is proposing a new underground deep geological repository system designed to safely contain and isolate used nuclear fuel. Wabigoon Lake Ojibway Nation (WLON) and the Township of Ignace have been selected as the host communities for the proposed project, which is located 21 kilometres southeast of the WLON and 43 kilometres northwest of the Town of Ignace, Ontario along Highway 17. As proposed, the Deep Geological Repository (DGR) for Canada's Used Nuclear Fuel Project would provide permanent storage for approximately 5.9 million bundles of used nuclear fuel. The project is expected to span approximately 160 years, encompassing site preparation, construction, operation and closure monitoring. The project assessment is being conducted in collaboration with the Canadian Nuclear Safety Commission.
Learn more about the Integrated Impact Assessment process which is led by the Impact Assessment Agency of Canada and Canadian Nuclear Safety Commission.
- Read the Summary of Issues (February 16, 2026)
- Read the Summary of the Initial Project Description (January 5, 2026)
- Read the Initial Project Description (January 5, 2026)
- Learn More about the Melgund Integrated Nuclear Impact Assessment (MINIA) Project
- Learn More about the Nuclear Waste Management Organization (NWMO)
Strategic Recommendation
The 30-day public comment window, which concluded on February 4, 2026, presented a severe impediment to meaningful community engagement. Given this constraint, all future recommendations must now pivot to the upcoming Impact Statement phase, which is scheduled to commence in spring 2026. This phase represents the critical opportunity to ensure that community concerns are formally integrated into the project's assessment framework.
Recreation Services & Program Delivery Alignment
In addressing this Valued Component (VC) issue, it is imperative to align all proposed mitigation and enhancement measures directly with the continuity and expansion of recreation services and program delivery. Ensuring that project activities do not disrupt existing community programming, and ideally provide opportunities for enhanced service delivery, must be a central pillar of the Impact Statement phase.
Understanding the Impacts of Nuclear Waste on our Community
This digital archive houses the public comments and specific intelligence reports addressing community concerns regarding Project 88774. The impact assessment is led jointly by the Impact Assessment Agency of Canada and the Canadian Nuclear Safety Commission.